Pages

Sunday, October 25, 2015

In a Heartbeat.....


Thirty years ago today we got married; for each of us it was our second time round.   Blending two lives, my kids, his kids and two households into one. Ever since then time and years have been slowly ticking away.  Its been quite the adventure too.  The picture below was taken a few weeks after we got married at my new mother in law's home.  On the wedding day, we forgot to bring a camera and our best man didn't bring his either.  To go home to get it would put us seriously late so we carried on with out it.



I occasionally went to work with Bruce and rode trains. In this case, the Canadian passenger train during Christmas through the Fraser Canyon.  1985


After we moved from the Vancouver area to the Okanagan Valley, we made new friends  both train and weaving related. Here we are waiting on the 1995 CN Christmas party to start after a couple of rounds! 


After another move to the Winfield area....a visitor caught this picture of us in 1998.


I climbed back up on a train again for Bruce's last run January 7th, 2000 and so that ended his 38 year career on the rails.


Another move back to the west coast and we are now on Vancouver Island. We took a trip to Saltspring Island with friends ( and bought four looms between us!) in late summer / early fall 2008. Here we are having a gelato break.


My brother came to visit and took this picture of us on the board walk in Cowichan Bay approximately  in 2010.


The two of us enjoying the warm summer breeze on the car deck of the ferry on our way to see our new born grandson in summer of 2012.



Finally.... us again taken on August 7th 2015.    I would say yes all over again and Bruce says he would ask again (or so he assures me!)


Here's the evolution of a Railway career (as a bonus).  Bruce here is age 13-14 or so...


... and here he is running the real trains....


.... and now he's back to playing pretend trains again!



Bruce tells me the best is yet to come!  




Friday, October 16, 2015

Time Challenges

Time is doing a funny thing in my house.  Its been two weeks since my surgery which feels like it just whipped by. I can see and feel positive changes in that short time, especially considering how awful I felt in the hospital at the time.  

Its also slowed to a crawl as well.  There is no hurrying the healing process and it takes as long as it takes. This means taking things easy, resting, using ice, eating well and the daily exercises.   The days tend to run into one another and all feel the same.

I'm guilty of watching too much TV, napping when I feel like it ( and sometimes even when I don't).  I'm reading lots and doing a bunch of hand work as well when light conditions allow.

I'm getting bored and in a hurry to get this done and over with.


Then we go out to either physiotherapy or to the doctors office and I come home as weak as a kitten and head back to my couch and elevate my swollen knee.

That's when the time thing hits me again. It will take as much as it needs..... no matter what I think or want !  Its the Boss of me.

So here's my new upgrade:


31 staples! My eye can see where they could have placed one more and made it even. 


The top row of images is my old knee before the operation.  These were taken two days post op. 


All staples are out and now its just steri-strips.  They will just fall off when ready (or with a little help :)   Now I must keep working on the exercises and keep bending the knee!   I had an 87 degree bend this past Tuesday at therapy. Yesterday I got a true 90 degree bend at the surgeon's office which made him happy.    They credit my strong quad muscles to all the treadling I did before surgery!   So weaving really does count as exercise....

So that's all for here..... back to my couch. I have a new Handwoven to read.

Tuesday, October 6, 2015

Glad to be Home Again.....


I'm home!   I'll be perfectly honest and say that was a week that I never care to repeat again.  Nasty.
The surgery went fine and no complications..... but the post op pain medicines that are opiate based did me in again.  So a  two to three day hospital stay turned into five days.

We knew what opiates I had intolerances to and so built a plan around what had worked okay last December. Until they failed me as well.   I was running out of options for pain control fast.    Finally they listened to me about what was given to me for pain control way back in 2001 when I had my first hip replaced and they found it and gave me some.

 Lo and behold.... it worked!

I felt much better after that and things progressed normally.   All this  kafuffle has put me behind on the physiotherapy plan though. I'm doing what they gave me to do in the hospital but its hard to make a leg bend that looks like a dead swollen pig.    Just keeping it moving seems part of the battle.  The swelling is normal and I hope that as when some of that slowly reduces I can get more 'bend'.  I see a physio next Tuesday.


So this will be my view for the coming Canadian Thanksgiving weekend:


... and I finally feel like I have my mental faculties back to attempt some hand sewing of hems.

Bye for now.... 

Sunday, September 27, 2015

Down to the Wire

Its been a very busy time since I last wrote!

In my last post I showed you a sixteen shaft draft for the Megado and a wonky shaft.... which is now fixed!   So this was done:






So the Megado is all set and working nicely.... and I have a basket of wound pirns. I plan to change the colour every 32-34 inches for a new towel colour. 

I also wet finished the previous project of book marks and have them all washed and pressed and in the Etsy shop for sale (which is now temporarily shut for my operation).  Twelve shaft twill in black 20/2 cotton and a fine linen; sett is 50 epi.


I have done a lot of tidy up in the studio. Put yarns aways, finish up sample records, and got a new clear plastic storage bin for the recent tapestry yarn purchase.  

What else can I do while recovering?  Well, when the time comes ... I can sit and wind a warp or three and so have one planned, complete with cones and notes all ready to go.




I got the warp on the Spring *finally* woven off.   It was a slow weave due mainly to my wonky knee but also because of the very fine weft used and all the hemstitching involved. Four rows at the start and a row of double hemstitching for the end hem.   It was a ten and a half yard warp and I got twelve guest towels and some samples.   They have been serged apart and pressed and pinned for hand sewing the hems while I recover.  I like to have some hand work to keep busy with.  I'll do a full project blog post once its all done, washed and pressed up and photographed for you. I'm going to wash and steam press them later.  Here are some of the towels waiting for the sewing needle:


Front edge of the butter cream towel

.... and the back edge.


Here are a few.... and there's twelve in all, featuring two different huck patterns 

I don't think the loom was even cold yet and the next warp was beamed on!   It was threaded and sleyed PDQ as well. Then she was hoisted up onto her crates and the tie up done.   I'm not likely to be able to weave on this loom for a time but its nice to know its ready for when I am.  The warp is for two scarves and one will be woven "as drawn in" and the second will be woven "network twill style". In fact the warp that is waiting to be wound on the warping mill is for another set of two scarves, woven the same two ways as well.  Different colours of course, but I won't have to change the tie up for a time. I sit on a low stool to do that and I'm not sure my new knee would like trying to get up from that until its well healed.... so I'm being kind to my future self!

Anyhow, here's the start of "as drawn in"  as a tease.... and there will be a more full disclosure much later on.



So that means everything is done and ready in the studio for my eventual return.   In the house I have been busy too!   

We have completed the last of the medical visits and tests.   We picked up all the equipment necessary at the Red Cross loans cupboard and our guest room is full of walkers, bath bench, raised toilet seat, crutches, a bed assist bar, another frame device to lift and keep the blankets off my knee, and my new cryo-cuff machine!


You place water and ice into the 'cooler' and a quiet little motor circulates the water via the hose to the pad which is wrapped around the (cloth covered) knee. This helps reduce swelling and inflammation.  We tried it out today as a trail run and it worked fine and no leaks.  You can barely hear the motor!  I wish I had known about this gizmo for my hip surgeries!   I used leaky  doubled bags of ice in 2001 for my left hip..... and frozen gel packs for the right hip this past December.    There are different pad types for different body parts available. What is shown above is called a universal and mine is specific for a knee joint.

We have arranged for a ride for me to come home using Medivan transport as our Santa Fe SUV isn't user friendly to get a newly operated left knee into.  Even with the seat back all the way, its still high off the ground and there's not enough swing room to get the knee in without doing a bend and a maybe twist.  Medivan staff will get me home and into the house, up the stairs and settled into my own bed.  That will be my big accomplishment for the day I'm sure! I'm thrilled to not have to worry about the stairs on my first day home!

The seasons are changing and work goes on around the house and yard to get ready. Bruce got the snow tires mounted on rims and onto the car yesterday. The higher elevation road between here and my hospital has the requirement of snow tires as of October 1st to March 30th.  So he'll be safe on his commute to see me at least!

Recent rains showed us that some repairs are required for our gutters and they will be done this Monday.   Lawn mowing has begun again now the grass has started to grow once more and the usual end of summer clean up has begun in the gardens and patio.  I'm just an observer in all these details....

We had an arborist come and assess some dead standing trees on the property that must be cut down before the winter wind storms start as they are too close to the house.  They died from the dry spell in the summer of 2014 and failed to revive this past spring.   We won't know what has died from the long drought this summer until spring 2016.   We also found that our neighbourhood deer have started eating things normally labeled in garden shops as "deer proof", so we need some new plants to add to their buffet.... but most likely next spring.

Now all I have left to do is some laundry, and pack my bag to go.  I have to report in 7:45 am on Monday. Yes, I'm nervous and wishing I didn't have the week to come ahead of me but I do want to get to the benefits of a new knee which is walking pain free, and weaving again.      Wish me luck!   

Bruce bought me some dahlias from a local roadside stand and I must say that they are simply lovely. A real other world inside the petals....  here are some shots so you can enjoy them too.





I'll see you here again soon. 

Tuesday, September 15, 2015

Time is Ticking Away

 I was looking out a window down our driveway and saw  the back of a large gray cat sitting on the driveway.   It was a very big cat and I could clearly see the ears...... when all of a sudden its entire head turned around "exorcist style" and I found myself looking into a pair of very stern yellow eyes!

It was a very large owl.... a very large Great Horned Owl sitting in my driveway!

Later on, Bruce found him (or her?) sitting in a tree along the driveway and his presence didn't faze the bird at all. He managed to snap a few pictures.  They are also known as the cat owl as they are a sufficiently large enough bird to bring one home for dinner!  The neighbour's cats are on their own but I'm more concerned about our little resident rabbit!


The markings on its feather blend with the tree bark very well!


We have a week of rain ahead of us and that's okay by me. I have a lot to do to get ready in the studio ahead of my "adventure" at Victoria Royal Jubilee Hospital.....

.......but I just couldn't leave the tapestry loom in a pile of nice lumber on the floor!   


I cleaned each piece and buffed out some marks with a magic eraser  and only found one wood bruise. For a loom that's 48 years old, that's pretty darn good!   Then using a couple of clear, detailed pictures I found on line, Bruce and I worked hard all afternoon to basically get all the main parts assembled while it lay flat on the floor.  


 By days end we turned around and found two big parts we had missed!    We decided to call it a day and try again the next day...

So,  a fresh start again the next day.  We were able to loosen off some bolts and squeak in the parts and then tighten it all up again.  It would seem that 95% of the parts need to be set between the two main sides and then all tightened up together.  Its a two person job provided they have six pairs of hands to hold everything in place and tighten things up at the same time!

Bruce got the treadles and brake release into place....


It had been a tough two days fighting with parts!


Two full afternoons of  intense togetherness and no fighting or barking at each other.... cool huh?


There she is!   All done and a light polish applied and cords secured.  Bruce says that if we ever move, it can be well wrapped and go out the door as one large object!    Now the loom can sit and wait a while for me.... and for the  yarn to arrive.

Which  two days later,  a large and heavy box arrived on my doorstep!  I had placed an order with Brassards in Quebec for some wools, cotton seine cord and some 2/8 cottons.


It was a satisfying box load!


Two different gauges of cotton seine cord for warps on the Tissart.


These are the Blue Mountain wools.... 2100 yards per pound, in twenty eight colours. I need to get a storage bin for them right away. Its a finer wool that I will use doubled.  Replacements will be bought as two pound cones as I see what colours I tend to favour. 


These are the 2/8 cottons. I have a hodge podge of other colours so hopefully this will help expand the selection for project planning. I hope to do some more plaids and tartans eventually.

So I'll be  reading up on tapestry techniques and planning on a beginners sampler.   Ah, all that and reading up on how to beam a warp on the Tissart too. Fortunately there is a good post on line to  refer to.  I'll even check You Tube just in case.... they seem to have everything there!

Bruce helped me with beaming eleven and a half yards on 2/8 natural cotton onto the Megado.  (He's a real keeper huh?) I got 554 ends all threaded and sleyed.   Then, I fired up the computer and Fiberworks today and hope to make a start on my sixteen shaft draft and this happened:



 So today I will have to make some adjustments to the cords and, with luck, I'll be happily weaving soon.  The draft is from Handweaving.net



I'm working on the set up of this loom first as its the one that will be easiest for me to use at some point in my recovery. There is just the one treadle and its very light to move. I also bought some springs to attach to the loom to reduce the inertia required to treadle. They are for weavers with joint issues. A smart idea!  

See the black springs between the cup hooks? That the extra lift and you can set the tension by moving to another hook.

The computer program does all the decision making so I can focus on just throwing the shuttle and watching the pattern grow.    Also, at this point the new fly shuttle might just have to wait for its working debut. I'm running out of time and I still have another loom to get sorted out!

Weaving on the Spring loom has been slow as my knee dictates what I can do and for how long. I've been using my (soon to be replaced) left knee and leg as much as possible to treadle the huck lace by way of 'exercise' but by the end of a session, its tired and very sore.  I finished weaving my planned  towel number twelve yesterday and yet I can still see warp enough for another.  So I will get busy with my bonus towel with its five rows of hemstitching!  I would like to get this warp done and off and then prep the towels ready for hemming. I thought I could hand sew the hems while recovering.

I have a tencel scarf warp to beam on next (see the last post)  and it shouldn't take long to thread.  I won't be able to  maneuver too well so I'd like to get the loom up on her crates and get the tie up done ahead of time.

I have two weeks to go but there are several days where I'll be visiting Doctors and pre-admission clinics and doing personal errands to get ready.   In between I'll be in the studio!

Tick-tock, tick-tock!